Skip to content
ZeroHouse

ZEROHOUSE KNOWLEDGE

Design Author Supervision for Energy-Efficient Homes

Design-author support helps coordinate design and execution. Define its scope, visits and outputs separately from the design package.

Starting agreement

Provide current drawings, programme, responsible parties and known questions. Agree consultation formats, review milestones and notification procedures before work starts.

Critical milestones

Concealed-work stages matter: foundation insulation, air barriers, windows and service penetrations. The review schedule depends on the design and agreed scope.

Documented output

The current Studio service describes agreed clarifications, review records and a deviation list. Link each issue to its location, drawing revision and closure method.

Responsibilities

Design support does not replace technical supervision, laboratory testing or contractor responsibility. Specialist investigations and independent certification need appropriate specialists and agreements.

Common mistakes

Inviting review after details are covered reduces visibility. Do not equate a photograph with a full inspection or absence of a comment with a guarantee of all concealed work.

Schedule → review → issue → correction → recordSchedulereviewissuecorrectionrecord
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
Before workRevisions and scheduleAgreement
During workDetails and changesRecords
AfterwardsIssue closureEvidence

What this means for your project

Coordinate review milestones with the contractor’s programme. Fees and scope should reflect visits, specialist checks and output formats.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.

Related reading

All guides in this topic · Construction support

Building envelope

Discuss your project