Backup for Well Pumps, MVHR and Refrigeration

Pumps, ventilation and refrigeration have different operating patterns. Check backup energy, simultaneity and starting for every critical system.

Function list

Record required functions: water, ventilation and food storage. Agree acceptable interruptions and possible water storage rather than assuming every load is continuous.

Starting and power

A pump or compressor may need a brief start demand above running power. Obtain documented or measured data and check inverter and BMS capability for its duration.

Energy budget

Use a refrigerator’s daily profile under relevant conditions and pump run time and cycling. Ventilation often runs for long periods, so modest power can accumulate substantial energy use.

Control and protection

Staggered starting can reduce simultaneous peaks if equipment permits it. Define critical circuits, transfer, protection and restart behaviour in the electrical design.

Common mistakes

Do not size an inverter solely from average daily energy. Consider winter battery temperature, starting charge and sensor or control failure.

Functions → profiles → starts → reserve → recoveryFunctionsprofilesstartsreserverecovery
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
PumpStarting and cyclesPeak check
VentilationLong operationEnergy
RefrigeratorCycles and temperatureDaily profile

What this means for your project

Prepare a measured critical-appliance list. Test simultaneous starting and the full transfer scenario before acceptance.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.