Energy management coordinates loads with available power, generation and reserve. Automate controllable functions within defined comfort limits.

Priorities

Separate critical, deferrable and comfort loads. The owner should agree what can shift in time and what must operate regardless of price or battery state.

Measurement

Use reliable power, charge-state and source-mode data. Check timestamps and sensor-loss behaviour; a bad signal must not create an unsafe state.

Controllable functions

EV charging, some water heating or appliance starts may allow time shifting. Agree limits for heating, ventilation and pumps rather than assuming unrestricted shutdown.

Backup scenario

Priorities may change during grid loss: battery reserve protects critical functions. Consider controller self-consumption, local operation without internet and manual recovery.

Common mistakes

Automation creates no energy and cannot fix inadequate connection capacity. Do not promise savings without tariffs, profiles and outcome measurement; check conflicts between controllers.

Priorities → measurement → rules → failure → testPrioritiesmeasurementrulesfailuretest
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
CriticalContinuityPriority
DeferrableTime windowSchedule
ComfortAgreed limitsControl

What this means for your project

Start with priorities and permitted interruptions. Test rules against real profiles and provide understandable manual control.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.

Related reading

All guides in this topic · Home autonomy

Backup power

Discuss your project

Define the permitted delay

A controllable load needs more than a power rating: establish how long it can be deferred without losing its required function. Water heating, battery charging and ventilation have different limits. Record priorities and behaviour on sensor or connection failure. Automation should implement an agreed scenario rather than switch every load at one threshold regardless of consequences for occupants or equipment.