DBN V.2.6-31:2021: Thermal Requirements Explained

DBN V.2.6-31:2021 addresses thermal insulation and building energy efficiency in Ukraine. This guide explains a review workflow; it does not replace the numerical requirements.

Document and status

The checked official register entry lists the document as active. Its title is Thermal Insulation and Energy Efficiency of Buildings; the entry references the approval order dated 30 December 2021, No. 366, and subsequent orders. Establish the applicable full-text edition for the project.

Review questions

Simplified explanation: envelope performance and whole-building energy are related but distinct assessments. Wall insulation alone cannot establish whole-building compliance.

Resistance, U and inclusions

ZeroHouse recommendation: record the method, areas, materials and included thermal bridges with each result. A homogeneous clear-wall section does not represent slab edges or window installation.

Whole-building efficiency

Coordinate envelope inputs with ventilation, heating, cooling and occupancy. Changes to windows or equipment after calculation require a model-impact review.

Drawings and common mistakes

Check layers, thermal boundaries, opening areas and junctions. A common error is copying an old requirements table without checking edition, climate conditions or scope.

What has not been verified here

The complete official text and numerical tables were not available for independent checking. Minimum R, maximum U and exemptions are therefore withheld; register status does not verify every technical clause.

Active record → full text → applicability → designActive recordfull textapplicabilitydesign
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
StatusOfficial registerChecked 2026-09-09
Numerical requirementsFull textVerification required
DesignModel + drawingsCoordinated set

What this means for your project

Request the designer’s document register with editions and relevant clauses. Review thermal bridges and summer comfort separately.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.