Skip to content
ZeroHouse

ZEROHOUSE KNOWLEDGE

Passive House Institute: Criteria and Documents Worth Knowing

Read PHI documents according to their purpose: building criteria, calculation tools and component certification are different things.

PHI’s role

The Passive House Institute develops criteria and tools for its system. Referencing PHI in a project description does not establish certification.

Criteria and classes

Assess Classic, Plus and Premium against the agreed criteria edition. An unofficial table or collection of component ratings is not a substitute.

PHPP and EnerPHit

PHPP supports energy planning. EnerPHit addresses existing-building retrofit through a separate assessment route, including staged work.

Buildings, professionals and components

A professional qualification is not a building certificate; a certified component does not certify the entire system. Verify the subject, holder and validity of each claim.

Official sources and versions

Start from PHI’s current pages and follow the relevant criteria or component database. Older PDFs may describe another edition or redirect to a general page.

Claims not made

ZeroHouse makes no building, professional or completed-project certification claim without separate evidence. This guide explains documents rather than assigning status.

Claim subject → official record → version → scopeClaim subjectofficial recordversionscope
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
PHPPModelInputs
ComponentSpecific productDatabase entry
BuildingProjectSeparate certificate

What this means for your project

State whether certification is required, who will review it and what evidence will be produced. Without this, Passive House remains an incomplete brief.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.

Related reading

All guides in this topic · Energy balance

Discuss your project

Building envelope