What to Check in a House Design Before Construction Starts

Before starting, check coordination rather than simply whether drawings exist. One unresolved entry or junction can affect several trades.

Plot, ground and foundation

Align boundaries, levels and access with the building location. Check that foundations respond to investigation, water and loads.

Envelope and junctions

Trace thermal and airtight boundaries. Plinths, floors and penetrations need details that can be built and inspected.

Windows and roof

Coordinate openings, frames, supports, shading and seals. Check roof drainage, penetrations and possible future PV fixings.

Ventilation, heating and cooling

Check equipment space, routes, noise and filter access. Heating selection should follow loads; summer operation needs its own assessment.

Electricity, backup and water

Align backup circuits with pumps, ventilation and controls. Water and drainage need coordinated entries, levels and maintenance access.

Revisions and inspections

All trades should use one current document set. Plan concealed-work inspections before covering, rather than after defects appear.

Inputs → drawings → interfaces → revision → inspectionsInputsdrawingsinterfacesrevisioninspections
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
InputsConfirmed?Investigation + conditions
DisciplinesCoordinated?Combined review
WorksInspectable?Hold points

What this means for your project

Use the project checklist as an action list with named owners. An empty entry means an unresolved question, not an absence of risk.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.