Skip to content
ZeroHouse

ZEROHOUSE KNOWLEDGE

House Design Brief: What It Should Include

A design brief turns preferences into verifiable decisions. It should describe living patterns, constraints and outputs, not just floor area.

Users and space

Record household composition, schedules, home working, accessibility and future changes. Separate essential requirements from preferences so trade-offs can be agreed transparently.

Site and inputs

Include the plan, orientation, terrain, known constraints and utilities. Mark missing investigations as open items with an owner and delivery date.

Comfort and energy

Define winter and summer comfort, ventilation, noise and critical outage functions. An energy-performance target needs a verification method rather than just the word passive.

Outputs and boundaries

List stages, drawings, calculations, formats and acceptance procedures. Separately define ground investigations, surveying, specialists, certification and site support where needed.

Changes and common mistakes

Budgets and schedules need priorities and allowance for input clarification. Do not hide conflicts between extensive glazing, no shading and a requirement for no cooling.

Needs → constraints → criteria → outputs → agreementNeedsconstraintscriteriaoutputsagreement
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
RequirementWhat is neededPriority
EvidenceHow to verifyMethod
OwnerWho and whenStage

What this means for your project

Send Studio a concise requirement list and known site data. The project checklist can reveal gaps but does not replace an agreed brief.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.

Related reading

All guides in this topic · Individual house design

Building envelope

Open the checklist