Skip to content
ZeroHouse

ZEROHOUSE KNOWLEDGE

Site Slope, Basement and Energy Performance

Slope and basements connect architecture with soil, water and the thermal boundary. They cannot be assessed simply as extra floor area.

Site investigations

Obtain surveying, ground investigation and water and neighbouring-building information. No visible water during one visit does not establish seasonal or long-term conditions.

Warm or unheated basement

Define room operation and trace insulation and airtightness boundaries. Stairs, doors and service penetrations must follow that decision.

Water and structure

Coordinate earth retention, waterproofing, drainage and discharge routes. Insulation selection does not replace foundation or slope-stability assessment.

Light and operation

A partly exposed basement can receive daylight, but façades and light wells need individual details. Check ventilation, maintenance access and water-entry risks.

Common mistakes

Do not model a basement as unheated when it is used as living space without an appropriate envelope. Excavation near neighbours needs impact assessment, not merely a boundary plan.

Site → investigation → regime → details → operationSiteinvestigationregimedetailsoperation
ZeroHouse assessment diagram; not a construction detail.
Project review matrix
ItemParameterCheck / result
GroundGeology and waterInvestigation
BasementTemperature regimeBoundary
SlopeRetention and impactStructure

What this means for your project

Define basement use before foundation design. Coordinate thermal, water and structural decisions using site investigations.

Sources and scope of review

Checked: 2026-09-09. Editorial guidance; not evidence of compliance for an individual building.

Related reading

All guides in this topic · Site consultation

Building envelope

Discuss your project